THỢ
Thợ VinHardLink

2026 Factory PCCC Fire Safety & Maintenance Prices in Bien Hoa, Amata & Nhon Trach (Dong Nai)

Direct Summary & Benchmark Range

Last updated: 2026-11-19

In Bien Hoa, Amata & Nhon Trach (Dong Nai) (Amata, Bien Hoa 2, Loteco, Nhon Trach 1-6, Long Thanh), refilling ABC/CO2 fire extinguishers costs 80,000-190,000 VND/cylinder, while 30-125HP PCCC pump skid servicing runs 3,360,000-7,880,000 VND. Local contractors arrive in 45-90 minutes.

Common / Pre-2025 Name: Tỉnh Đồng Nai (TP. Biên Hòa, Huyện Nhơn Trạch, Long Thành)
Post-2025 Official Tier: Tỉnh Đồng Nai (đơn vị hành chính 2 cấp Tỉnh -> Phường/Xã)

2026 Field Benchmark Prices & Acceptance Checkpoints

Service ItemSpecificationFair Benchmark (VND)Anti-Overcharge Checkpoint
ABC Powder / CO2 Fire Extinguisher Refill & CheckMFZL4 / MT3 - MT580,000 - 190,000 / cylinderRequire fresh inspection tag, verify CO2 net weight, and check tamper seal
PCCC Fire Pump Skid Maintenance (Electric + Diesel + Jockey)30 - 125 HP3,360,000 - 7,880,000 / skidDrop header pressure to 6-7 bar to verify auto-start and test Diesel battery CCA
Smoke Detector / Sprinkler Head Replacement & Loop TestZone / Addressable370,000 - 1,000,000 / pointTrigger real aerosol smoke test to confirm panel alarm signal without bypass
Factory PCCC Compliance Audit & Pre-Inspection PrepTheo quy mô m²4,730,000 - 15,750,000 / auditProvide itemized punch-list separating hardware fixes from documentation fees

Field Cost Estimator

Estimated Fair Range80,000 - 190,000 VND

One-Click Vietnamese Zalo Dispatch Script

Chào anh/chị, nhà máy bên mình tại Amata, Biên Hòa 2, Long Bình (Loteco), Nhơn Trạch 1-6, Long Thành (KCN Biên Hòa - Amata - Nhơn Trạch (Đồng Nai)) cần bảo trì hệ thống PCCC (nạp ... bình chữa cháy, kiểm tra bơm PCCC và đầu báo khói). Nhờ đơn vị mình gửi báo giá chi tiết có tem kiểm định và xuất VAT giúp bên mình nhé.

1. Top 4 PCCC Compliance Failures Observed in Bien Hoa, Amata & Nhon Trach (Dong Nai)

Across Amata, Bien Hoa 2, Loteco, Nhon Trach 1-6, Long Thanh plants, over 70% of audit citations stem from four issues: emergency exit lights failing the 120-minute battery run test, dead diesel fire pump cranking batteries failing 6-7 bar auto-start, silenced alarm panel fault zones, and warehouse stock stacked closer than 50 cm below sprinkler heads.

2. Verifying PCCC Inspection Tags & CO2 Net Weights

Ensure all replacement extinguishers, exit lights, and hoses carry official PCCC inspection stickers plus signed maintenance test sheets. For CO2 cylinder refills, weigh units on site: an MT3 bottle must weigh its stamped tare weight plus 3 kg of CO2.

Self-Inspection Tools & Consumables

Contains Shopee Mall / Lazada affiliate links.

Smoke Detector Aerosol Test Spray

Monthly self-test smoke loops so dead sensors never surprise safety audits

180,000 - 380,000 VNDCheck on Shopee/Lazada ↗

PCCC-Certified LED Exit & Emergency Light

Replace weak-battery exit signs ahead of inspections without emergency markups

160,000 - 340,000 VNDCheck on Shopee/Lazada ↗

Verified & Deduplicated Zone Contractors

⚠ Demo seed entries active (placeholder numbers +849000000xx). Real vetted contractors replace demo records before launch.
★ FEATURED24/7 DispatchVAT Invoicevizhen

Cơ Điện & Chiller Đồng Nai Amata Services (Demo)

KCN Amata, Phường Long Bình, Biên Hòa, Đồng Nai

📍 3.6 km
🔥 38 facility inquiries this month
📞 Call Now: 0900000005💬 Open Zalo + Copy Script

Self-Serve Zone Featured Slot (VietQR / SePay)

Transfer with the exact reference memo below. Featured status extends automatically within seconds.

30 Days Featured: 300,000 VND
90 Days Featured: 800,000 VND
Required Transfer Memo
SEVHL THOBD01

Frequently Asked Questions

What is the fair rate for refilling fire extinguishers in Bien Hoa, Amata & Nhon Trach (Dong Nai)?

+

For 15-20+ cylinders, expect 75,000-120,000 VND for 4-8 kg ABC powder and 110,000-180,000 VND for 3-5 kg CO2 units.

How often must factories service PCCC equipment in Vietnam?

+

Perform monthly internal gauge checks and schedule full certified contractor testing every 6-12 months.

How do you confirm powder was actually replaced rather than repressurized?

+

Check new lead valve seals, inspect fresh nozzle powder cleanliness, and test-discharge one expiring unit before pickup.

Do PCCC contractors supply VAT invoices and audit logbooks?

+

Licensed PCCC companies provide 8-10% VAT e-invoices plus stamped system test records required by fire authorities.

How does the July 2025 boundary reform affect PCCC logbooks?

+

Records referencing Tỉnh Đồng Nai (TP. Biên Hòa, Huyện Nhơn Trạch, Long Thành) now map to Tỉnh Đồng Nai (đơn vị hành chính 2 cấp Tỉnh -> Phường/Xã); update annual inspection logs to match your latest ERC address.

2026 Price IndexContractors